Ontario's 2024 Building Code came into effect on January 1, 2025. The province's 2024 Building Code page, first published on 2024-05-31, says the new code removes at least 1,730 technical variations between Ontario and national requirements, and names Part 7 among the existing parts that were revised. In Ontario's code, Part 7 is the plumbing part.
The dates every Ontario plumbing office should have on file
The answer first: anything permitted from April 1, 2025 onward falls under the 2024 code.
Ontario set out the transition like this:
| Permit application submitted | Code used |
|---|---|
| Up to December 31, 2024 | 2012 Building Code |
| January 1 to March 31, 2025 | 2024 code, or the 2012 code if working drawings were substantially complete by December 31, 2024 |
| From April 1, 2025 | 2024 Building Code |
By late 2026 the transition is history for most service work, but it still matters for projects that were designed in 2024 and are only now reaching rough-in. If a builder hands you drawings from that window, ask which edition the permit was issued under before you price.
A shorter regulation, a longer reference trail
Ontario changed how the code is written, and that changes how your staff look things up.
According to the province, the regulation itself is now a single page. It adopts the 2020 National Building Code of Canada, except where the Ontario Amendment Document changes it. The province also says the full-length code will no longer be published on e-Laws. Instead, Ontario offers a 2024 Building Code Compendium as HTML, as a downloadable PDF and in print; the Ontario's Building Code page lists those formats.
For a plumbing company, the practical effect is that the office copy of the code may now be two documents read together: the national text and Ontario's amendments. Make sure your estimators and lead hands know where both live, and that nobody is quoting from an old 2012 binder.
What else the province changed
Two other changes are worth knowing even if they aren't plumbing.
- A new Part 2 for farm buildings. Ontario added farm buildings as their own part of the code.
- Revisions to Parts 3 and 9 as well as 7. Part 9 covers houses and small buildings, which is where most residential plumbing work happens alongside Part 7.
- Code exams. The province says Building Code exams have been based on the 2024 code since March 30, 2026.
Ontario has also marked its 2024 code page as archived, which means you should treat the current Ontario's Building Code page as the place to check for amendments. This article summarises public information only; for compliance questions, go to the ministry, your municipal building department or a qualified designer.
Why harmonization helps plumbing companies that market across borders
Fewer Ontario-only variations means the province's plumbing rules sit closer to the national model. That has a marketing upside for companies near the Quebec or Manitoba borders and for anyone who publishes advice online.
When the rules are closer to national text, a well-written explainer page about a plumbing topic needs fewer "except in Ontario" caveats. It also means national news, such as the publication of the 2025 National Plumbing Code, is more likely to matter in Ontario in a future update. Ontario's 2024 code is built on the 2020 National Building Code; we found no provincial announcement about moving to the 2025 national editions as of October 2026.
How to turn this into customer-facing content
Homeowners rarely search for "Part 7". They search for the problem: a permit for a basement bathroom, a backwater valve, a water heater swap. The code change is useful to you as context, not as a headline.
A few honest ways to use it:
- Update your permit FAQ. If your site explains when a permit is needed, check the wording still matches the 2024 code and your municipality's process.
- Date your advice. Write "as of October 2026" and link the province's page. Readers trust dated content, and so do search engines.
- Avoid promises. Don't write "fully code compliant" as a slogan; explain what you do and who inspects it.
Our Ontario coverage page lists the regulators plumbers deal with in the province, and the industry content service explains how we write this kind of page for clients. For the rest of our coverage, see the newsroom.
Frequently asked questions
When did the 2024 Ontario Building Code take effect?
January 1, 2025, according to the province, with a three-month grace period to March 31, 2025. From April 1, 2025, permit applications had to be submitted under the 2024 code.
Does the 2024 code follow the National Plumbing Code?
The province says the new regulation adopts the 2020 National Building Code of Canada except where an Ontario Amendment Document changes it, and that at least 1,730 technical variations from national requirements were removed. Check the compendium for the exact plumbing text.
Where do I find the full text now?
Ontario says the full-length code is no longer on e-Laws. The 2024 Building Code Compendium is offered as HTML, as a PDF and in print.
Sources
- Ontario.ca: The 2024 Ontario Building Code (published 2024-05-31) (2024-05-31)
- Ontario.ca: Ontario's Building Code (2026-10-22)